JR line3 min read

San'yo Main Line

山陽本線

The San'yō Main Line is a major railway line owned by JR Group companies in western Japan, connecting Kōbe Station and Moji Station and largely paralleling the coast of the Seto Inland Sea, the southern coast of western Honshū.

Running west from Kōbe in Hyōgo Prefecture, it passes through Himeji, Okayama, Fukuyama, Hiroshima and Shimonoseki before crossing to Moji in Kitakyushu, Fukuoka Prefecture, where it connects with the Kagoshima Main Line. The line's name derives from the ancient region and highway San'yōdō, the road on the sunny (south) side of the mountains. Its total length is 537.1 km: the Kōbe–Shimonoseki trunk is 528.1 km, the Shimonoseki–Moji section across the Kanmon Strait is 6.3 km, and a short 2.7 km branch, the Wadamisaki Line, runs between Hyōgo and Wadamisaki stations in Kobe. The line is built to 1,067 mm gauge.

Route of the San'yo Main Line · Hyogo · Okayama · Hiroshima · Yamaguchi · Fukuoka · Borders: MLIT
A 115-3000 series local train bound for Shimonoseki running along the Seto Inland Sea on the San'yo Main Line.
A 115-3000 series local train bound for Shimonoseki running along the Seto Inland Sea on the San'yo Main Line. · MaedaAkihiko · CC BY-SA 4.0 · Wikimedia Commons

History

The entire route between Kobe and Shimonoseki was originally built by the private Sanyō Railway company. The first section, between Hyōgo Station in Kobe and Akashi Station, opened on 1 November 1888. In 1889 the line was extended east to Kobe Station — as a double-track section connecting with the government railway — and west toward Tatsuno. The Sanyō Railway was progressively extended westward, reaching Okayama and then Fukuyama in 1891 and Hiroshima in 1894, and on 27 May 1901 it reached Bakan Station (now Shimonoseki), completing the route from Kobe. Under the Railway Nationalization Act of 1906 the Sanyō Railway was purchased by the Japanese government and renamed the Sanyō Main Line (山陽本線), a line name formally designated in the government railway's naming list in 1909.

Double-tracking (duplication) proceeded over several decades. The Hyōgo–Himeji section was duplicated in 1899 and the Hiroshima–Kaitaichi section in 1903. After nationalisation, further duplications followed — Kamigōri–Yoshinaga in 1910/11, Hatabu–Shimonoseki in 1915 and Himeji–Agaho in 1917 — and work to duplicate the remainder began in 1921, opening in stages until completed in 1930, with the exception of the section between Iwakuni and Kushigahama. There, a new direct inland line that bypassed the coastal route via Yanai required significant tunnelling, and unexpected geological instability delayed its completion until 1934, when it opened as a single track. Although that new line became the Sanyō Main Line at the time, in 1944 the original coastal alignment was double-tracked and returned to the formal Sanyō Main Line, the former bypass becoming the Gantoku Line.

The line was originally connected to Kyushu by rail-ferry from Shimonoseki. In 1942 the Kanmon Tunnel beneath the Kanmon Strait, the world's first undersea tunnel, was completed and the San'yō Main Line was extended to Moji Station; a second, duplicating tunnel opened in 1944.

A 223-2000 series Special Rapid bound for Himeji between Suma and Shioya on the San'yo Main Line. View full size (opens in a new tab)
A 223-2000 series Special Rapid bound for Himeji between Suma and Shioya on the San'yo Main Line.MaedaAkihiko · CC BY-SA 4.0 · Wikimedia Commons

The Kobe–Akashi section was electrified in 1934; electrification reached Himeji in 1958 and Hiroshima in 1962, and the entire line (except the Wadamisaki branch) was electrified in 1964 to coincide with the opening of the Tōkaidō Shinkansen between Tokyo and Shin-Osaka that same year. With that connection in place, limited express and express trains ran frequently across the line toward destinations throughout western Japan. The Wadamisaki Line itself was finally electrified in 2001.

The opening of the parallel San'yō Shinkansen reshaped the conventional line's role. Before the Shinkansen, the San'yō Main Line was a major transport corridor through western Honshū and on to Kyushu, carrying many express services. The Shinkansen was extended to Okayama Station in 1972 and to Hakata Station in 1975; on both occasions many express services on the conventional line were withdrawn, and since 1972 the line has been used mainly by local and freight services. Centralised traffic control (CTC) was commissioned between Mihara and Shimonoseki in 1984.

Today the San'yō Main Line is operated by two JR passenger companies and JR Freight. JR West runs the Kōbe–Shimonoseki portion (branding it the JR Kobe Line over the Kōbe–Himeji section and the San'yō Line beyond), JR Kyushu operates the Shimonoseki–Moji section, and Japan Freight Railway runs freight over the route from Kobe to the Kitakyushu Freight Terminal. Maximum line speeds are 130 km/h from Kōbe to Himeji, 120 km/h from Okayama to Shimonoseki and 85 km/h on the Hyōgo–Wadamisaki branch.

A container freight train hauled by JR Freight EF210-324 between Niwase and Nakasho on the San'yo Main Line. View full size (opens in a new tab)
A container freight train hauled by JR Freight EF210-324 between Niwase and Nakasho on the San'yo Main Line.MaedaAkihiko · CC BY-SA 4.0 · Wikimedia Commons

The section between Kobe and Nishi-Akashi was severely damaged by the 1995 Great Hanshin earthquake and took ten weeks to repair. In 2018, heavy rain during the July floods forced the closure of the Okayama–Shimonoseki section from 6 July; the majority of services were restored between 8 and 18 July, but some sections stayed closed for longer, and services between Yanai and Kudamatsu did not resume until 9 September that year.

Stations on this line

127 stations tracked on the map, listed alphabetically. Select any to read its page.

Timeline

  • 1888The private Sanyō Railway opens the first section, Hyōgo–Akashi, on 1 November.
  • 1889The line is extended east to Kobe Station (double-track, connecting with the government railway) and west toward Tatsuno.
  • 1891The Sanyō Railway reaches Okayama and Fukuyama.
  • 1894The line reaches Hiroshima.
  • 1899The Hyōgo–Himeji section is duplicated (double-tracked).
  • 1901The line reaches Bakan (now Shimonoseki) on 27 May, completing the Kobe–Bakan route.
  • 1903The Hiroshima–Kaitaichi section is duplicated.
  • 1906Under the Railway Nationalization Act, the Sanyō Railway is purchased by the government and renamed the Sanyō Main Line.
  • 1909The formal line name, Sanyō Main Line (山陽本線), is designated in the government railway's line-naming list.
  • 1930Duplication of the remainder of the line (begun 1921) is completed in stages, except the Iwakuni–Kushigahama section.
  • 1934The Kobe–Akashi section is electrified. A new direct inland line (delayed by geological instability) opens as single track and becomes the Sanyō Main Line.
  • 1942The Kanmon Tunnel under the Kanmon Strait, the world's first undersea tunnel, is completed and the line is extended to Moji Station.
  • 1944The original coastal alignment is double-tracked and returned to the Sanyō Main Line; the former bypass becomes the Gantoku Line. A second Kanmon tunnel opens.
  • 1958Electrification is extended to Himeji.
  • 1962Electrification is extended to Hiroshima.
  • 1964The entire line (except the Wadamisaki branch) is electrified, to coincide with the opening of the Tōkaidō Shinkansen.
  • 1972The San'yō Shinkansen is extended to Okayama; many express services are withdrawn and the line becomes mainly local and freight.
  • 1975The San'yō Shinkansen is extended to Hakata; further express services on the conventional line are withdrawn.
  • 1984CTC signalling is commissioned between Mihara and Shimonoseki.
  • 1995The Kobe–Nishi-Akashi section is severely damaged by the Great Hanshin earthquake (17 January) and takes ten weeks to repair.
  • 2001The Wadamisaki Line (Hyōgo–Wadamisaki branch) is electrified.
  • 2018The July floods close the Okayama–Shimonoseki section from 6 July; most services resume 8–18 July, but some sections stay closed for longer, and Yanai–Kudamatsu does not reopen until 9 September.

Sources