History
The line was not built as a single project; its earliest segments were opened by private railway companies. At the eastern, Mie-Prefecture end, the Kansai Railway opened the first segment — the Kameyama–Ishinden section of its Tsu branch — on 21 August 1891, and the Sangu Railway opened a Tsu–Miyagawa section in 1893. Both of these companies were nationalised on 1 October 1907. At the western, Wakayama-Prefecture end, a short link between Wakayama (the original station of that name, now Kiwa) and Wakayamashi opened in 1903, and the Kansai Railway took over the Kiwa Railway’s line the following year. On the south-eastern coast the Shingu Railway opened a Kii-Katsuura–Miwasaki section in 1912 and extended it to Shingū in 1913, and that company was nationalised in 1934.
The government built the rest of the line over several decades, advancing from both ends and the middle. Working under the names Kisei East Line, Kisei West Line and Kisei Middle Line, the Japanese Government Railways (JGR) pushed from Ōkaguchi (now Taki) toward Owase, south from Wakayama and south from Kii-Katsuura, opening dozens of intermediate stations between 1923 and 1940. JGR’s successor, Japanese National Railways (JNR), opened the last gap, on the coast between Owase and Shingū, in stages between 1956 and 1959. The final link — the Mikisato–Atashika section — opened on 15 July 1959, joining the network end to end; the route from Kameyama to the original Wakayama Station was thereupon designated the Kisei Main Line, and on the same day Kii-Kimoto Station was renamed Kumanoshi and Ōkaguchi was renamed Taki. Just over two months after completion, the Ise-wan Typhoon of 26 September 1959 washed away the Kushida River bridge between Tokuwa and Taki; a temporary bridge restored service on 17 October 1959.
Capacity work also came slowly. Two early double-track segments — Akogi–Takachaya (1909) and Matsusaka–Tokuwa (1911) — were returned to single track in 1944 so the recovered materials could be recycled for the war effort. Sustained double-tracking came later and on one stretch only: the Wakayama–Kii-Tanabe corridor was progressively doubled through the 1960s and 1970s, with the Haya–Minabe segment in January 1978 completing the double-track Kii-Tanabe–Wakayama section. The rest of the line remains single track. Centralised traffic control (CTC) was introduced on the Shingū–Wakayama portion in March 1978 and extended over the Kameyama–Shingū portion in December 1983.
Electrification was confined to the western, Wakayama-side half. The Shingū–Wakayama-So section was electrified at 1,500 V DC and opened to electric service on 2 October 1978 — the same day the limited express Nanki began running between Nagoya and Kii-Katsuura and the Kuroshio was recast as a Tennōji–Shirahama/Shingū service — and the short Wakayama–Wakayamashi section was electrified on 1 October 1984. The Kameyama–Shingū half on the JR Central side was never electrified and remains diesel-worked. Freight operations between Kii-Sano and Wakayama ended on 1 November 1986.
On 1 April 1987, with the breakup and privatisation of JNR, the line was split between two of the successor companies. The Central Japan Railway Company (JR Central) took over the Kameyama–Shingū section (180.2 km) and the West Japan Railway Company (JR West) took over the Shingū–Wakayamashi section (204.0 km), while Japan Freight Railway (JR Freight) became a category-2 operator over part of the route. That division still defines the line: JR Central runs the non-electrified eastern half from Kameyama to Shingū, and JR West runs the electrified western half from Shingū to Wakayamashi, where a roughly 1.0 km stretch approaching Wakayamashi Station is owned by the Nankai Electric Railway. The boundary between the two operators is at Shingū, where JR Central and JR West trains meet.
In service terms the line is both an inter-city limited-express corridor and a chain of local sections. The Nanki limited express links Nagoya with Shingū or Kii-Katsuura via the Kansai Main Line and the Ise Railway, with four return workings a day, and the Kuroshio limited express links Kyoto, Shin-Ōsaka and Tennōji with Shirahama and Shingū, with fifteen return workings a day; some JR West limited expresses use tilting trains to take curves at speed. Maximum line speed reaches 110 km/h on parts of the Kii-Tonda–Shirahama–Wakayama stretch for the 283/287/289-series limited-express sets, and is lower elsewhere. Local service is generally divided into segments around Shingū, Kii-Tanabe, Gobō and Wakayama. With 180 tunnels totalling 68.9 km, the Kisei Main Line has the most tunnels of any single line in the JR Group; among lines operated by a single company, the San’in Main Line, with 176, has the most. The line has also seen incidents, among them a train collision at Rokken Station on 15 October 1956 (the “Rokken accident”), during the construction era. In recent years the Shingū–Shirahama section has drawn attention after JR West disclosed that its fiscal 2019 transport density was below 2,000 passengers per day.
Stations on this line
96 stations tracked on the map, listed alphabetically. Select any to read its page.
- Aiga相賀
- Akogi阿漕
- Arii有井
- Aso (Mie)阿曽
- Asso朝来
- Atashika新鹿
- Atawa阿田和
- Dojoji道成寺
- Esumi江住
- Fujinami (Wakayama)藤並
- Funatsu (Kihoku)船津
- Gobo御坊
- Hadasu波田須
- Hatsushima初島
- Haya芳養
- Hirokawa Beach広川ビーチ
- Inahara稲原
- Inami印南
- Ise-Kashiwazaki伊勢柏崎
- Ishinden一身田
- Iwashiro岩代
- Kainan海南
- Kameyama (Mie)亀山
- Kamogo加茂郷
- Kata賀田
- Kawazoe川添
- Kii-Arita紀伊有田
- Kii-Hiki紀伊日置
- Kii-Hime紀伊姫
- Kii-Ichigi紀伊市木
- Kii-Ida紀伊井田
- Kii-Katsuura紀伊勝浦
- Kii-Miyahara紀伊宮原
- Kii-Nagashima紀伊長島
- Kii-Sano紀伊佐野
- Kii-Shinjo紀伊新庄
- Kii-Tahara紀伊田原
- Kii-Tanabe紀伊田辺
- Kii-Tenma紀伊天満
- Kii-Tonda紀伊富田
- Kii-Uchihara紀伊内原
- Kii-Uragami紀伊浦神
- Kii-Yura紀伊由良
- Kimiidera紀三井寺
- Kirime切目
- Kiwa (Wakayama)紀和
- Koshiyama神志山
- Koza古座
- Kuki (Mie)九鬼
- Kumanoshi熊野市
- Kuroe黒江
- Kushimoto串本
- Matsusaka松阪
- Mikisato三木里
- Minabe南部
- Minose三野瀬
- Minoshima箕島
- Mirozu見老津
- Misedani三瀬谷
- Miwasaki三輪崎
- Miyamae宮前
- Nachi那智
- Nigishima二木島
- Odomari大泊
- Oka (Mie)相可
- Osoneura大曽根浦
- Ouchiyama大内山
- Owase尾鷲
- Rokken (Mie)六軒
- Sana佐奈
- Shimizuura冷水浦
- Shimonosho下庄
- Shimosato下里
- Shimotsu下津
- Shingu新宮
- Shirahama白浜
- Susami周参見
- Taiji太地
- Takachaya高茶屋
- Taki (Mie)多気
- Takihara滝原
- Tako田子
- Tanami田並
- Tochihara栃原
- Tokuwa徳和
- Tsu津
- Tsubaki椿
- Udono鵜殿
- Ukui宇久井
- Umegadani梅ヶ谷
- Wabuka和深
- Wakayama和歌山
- Wakayamashi和歌山市
- Wasa和佐
- Yuasa湯浅
- Yukawa湯川
Timeline
- 189121 August: the Kansai Railway opens its Tsu branch from Kameyama toward Tsu — the first segment of what becomes the Kisei Main Line.
- 1893The Sangu Railway opens the Tsu–Miyagawa section.
- 1903A short link between Wakayama (the original station of that name, now Kiwa) and Wakayamashi opens; the Kansai Railway takes over the Kiwa Railway’s line the following year (1904).
- 19071 October: the Kansai Railway and the Sangu Railway are nationalised.
- 1912The Shingu Railway opens the Kii-Katsuura–Miwasaki section; it is extended to Shingū the following year (1913).
- 1934The Shingu Railway is nationalised.
- 1944The early double-track Akogi–Takachaya and Matsusaka–Tokuwa sections are returned to single track, the recovered materials recycled for the war effort.
- 195615 October: a train collision at Rokken Station (the “Rokken accident”) occurs during the construction era.
- 195915 July: the final Mikisato–Atashika link opens, completing the line end to end; Kameyama–Wakayama (the original Wakayama Station, now Kiwa) is designated the Kisei Main Line. 26 September: the Ise-wan Typhoon destroys the Kushida River bridge (Tokuwa–Taki); a temporary bridge restores service on 17 October.
- 19651 March: the Kuroshio limited express begins operating (initially Nagoya–Tennōji).
- 1978January: double-tracking of the Kii-Tanabe–Wakayama section is completed (Haya–Minabe segment). March: CTC introduced on Shingū–Wakayama. 2 October: Shingū–Wakayama electrified at 1,500 V DC; the Nanki limited express begins (Nagoya–Kii-Katsuura) and the Kuroshio is recast as Tennōji–Shirahama/Shingū.
- 1983December: CTC extended over the Kameyama–Shingū section.
- 19841 October: the Wakayama–Wakayamashi section is electrified.
- 19861 November: freight operations between Kii-Sano and Wakayama cease.
- 19871 April: JNR is privatised. Kameyama–Shingū (180.2 km) goes to JR Central, Shingū–Wakayamashi (204.0 km) to JR West; JR Freight becomes a category-2 operator over part of the route.
- 20151 August: JR Central introduces KiHa 25 series DMUs on the Kisei Main Line (and Sangū Line), replacing KiHa 11 units.
Sources
Gallery 6 photos
Every photo for this page. Tap any image to view it full-size. All from Wikimedia Commons (credit under each).