JR line4 min read

Hokuriku Main Line

北陸線

The Hokuriku Main Line (北陸本線, Hokuriku-honsen) is a railway line operated by the West Japan Railway Company (JR West) as Category-1 operator with the Japan Freight Railway Company (JR Freight) running freight over it.

Today it is a short trunk line of only 45.9 kilometres between Maibara Station in Maibara, Shiga Prefecture, and Tsuruga Station in Tsuruga, Fukui Prefecture, laid to 1,067 mm narrow gauge and electrified at 1,500 V DC, with twelve passenger stations. This compact remnant belies its history: the Hokuriku Main Line was once a 353.8-kilometre artery running all the way from Maibara up the Hokuriku coast through Fukui, Kanazawa and Toyama to Naoetsu in Niigata Prefecture, and most of that length was hived off to third-sector railways as the parallel Hokuriku Shinkansen advanced.

MaibaraHikone10 km
Route of the Hokuriku Main Line · Fukui · Shiga · Boundaries: MLIT / GSI / Japan Post

History

The line began as a state-built railway. On 10 March 1882 the first section opened between Nagahama and Yanagase, together with a separate section from the tunnel mouth down to Tsuruga Port (then Kanegasaki) Station. Boring the Yanagase Tunnel proved difficult, and only when it was completed on 16 April 1884 was the Nagahama–Tsuruga route opened throughout. The southern end was joined to the Tōkaidō Main Line at Maibara when the Maibara–Nagahama section opened on 1 July 1889.

From Tsuruga the railway was then carried steadily north up the coast. The Tsuruga–Fukui section opened on 15 July 1896 as the "Hokuriku Line". It reached Komatsu in 1897, Kanazawa on 1 April 1898, Takaoka on 1 November 1898 and Toyama on 20 March 1899. The advance towards Niigata followed in stages — Toyama to Uozu in 1908 and on to Tomari in 1910 — while the Itoigawa–Naoetsu section was opened from the Naoetsu end in 1911 and 1912 as part of the Shin'etsu Line. The final link, between Ōmi and Itoigawa, opened on 1 April 1913, completing the whole Maibara–Naoetsu line. On 12 October 1909 the government's line-naming ordinance had formally renamed the route the Hokuriku Main Line.

The mid-twentieth century brought a large-scale campaign of tunnelling and realignment that replaced the line's hardest mountain sections with modern alignments. In 1957 a new line was built between Kinomoto, Ōmi-Shiotsu and Tsuruga, and the steeply graded original alignment through the Yanagase Tunnel was split off as the separate Yanagase Line, which was later closed. The 13,870-metre Hokuriku Tunnel between Tsuruga and Imajō, opened on 10 June 1962, let the railway abandon the tortuous original route via Sugitsu. Further deviations through long tunnels followed on the Niigata side, and with the rerouting of the Uramoto–Tanihama–Naoetsu section in 1969 the line was finally double-tracked and electrified throughout.

Electrification proceeded in tandem with these works. The Tamura–Tsuruga section, including the new line via Ōmi-Shiotsu, was electrified at 20 kV AC in 1957, and AC electrification was extended up the coast as far as Itoigawa by 1965. The section nearest Maibara, from Maibara to Tamura, was electrified at 1,500 V DC in 1962, and the Itoigawa–Naoetsu section was electrified at 1,500 V DC in 1969 to match the Shin'etsu Main Line, which the line joined at Naoetsu. To bridge the two systems, dual-voltage trains ran across the AC/DC boundaries, and the boundary on the Maibara side was shifted northward over the years — the Tamura–Nagahama stretch was converted from AC to DC on 14 September 1991, and the Nagahama–Tsuruga stretch on 24 September 2006, extending direct DC commuter services from the Kansai region as far as Tsuruga. When Japanese National Railways was divided and privatised on 1 April 1987, the entire Maibara–Naoetsu line passed to JR West.

The opening of the Hokuriku Shinkansen then dismantled the conventional trunk line in two stages. When the Shinkansen was extended from Nagano to Kanazawa on 14 March 2015, the parallel conventional line from Kanazawa to Naoetsu — some 177.2 kilometres — was separated from JR West and divided among three third-sector operators: the IR Ishikawa Railway took the Kanazawa–Kurikara section, the Ainokaze Toyama Railway the Kurikara–Ichiburi section through Toyama Prefecture, and the Echigo Tokimeki Railway the Ichiburi–Naoetsu section in Niigata. With the further extension of the Shinkansen from Kanazawa to Tsuruga on 16 March 2024, the remaining Tsuruga–Kanazawa section — about 130.7 kilometres — was likewise separated, passing to Hapi-Line Fukui between Tsuruga and Daishōji and to the IR Ishikawa Railway between Daishōji and Kanazawa.

These transfers reduced the Hokuriku Main Line to the single Maibara–Tsuruga section it occupies today. What remains is a busy but modest 45.9-kilometre line where the Kansai-region 1,500 V DC network meets the Hokuriku Shinkansen at Tsuruga, carrying local services and JR Freight trains and serving as the connecting link between the Tōkaidō corridor at Maibara and the high-speed line into the Hokuriku region.

Stations on this line

Timeline

  • 188210 March: the first section opens between Nagahama and Yanagase, with a separate section from the tunnel mouth to Tsuruga Port (then Kanegasaki) Station, as a state-built railway.
  • 188416 April: the Yanagase Tunnel is completed, opening the Nagahama–Tsuruga Port route throughout.
  • 18891 July: the Maibara–Nagahama section opens, joining the line to the Tōkaidō Main Line at Maibara.
  • 189615 July: the Tsuruga–Fukui section opens as the 'Hokuriku Line'.
  • 18981 April: the line is extended to Kanazawa; on 1 November it reaches Takaoka (Komatsu had been reached in 1897).
  • 189920 March: the Takaoka–Toyama section opens, carrying the railway into Toyama.
  • 190912 October: under the government's line-naming ordinance, the route is renamed the Hokuriku Main Line.
  • 19131 April: the final section is completed, opening the whole Maibara–Naoetsu line throughout.
  • 19571 October: a new line opens between Kinomoto, Ōmi-Shiotsu and Tsuruga with 20 kV AC electrification; the steep original alignment through the Yanagase Tunnel is split off as the Yanagase Line and later closed.
  • 196210 June: the 13,870 m Hokuriku Tunnel opens, rerouting Tsuruga–Imajō and replacing the original route via Sugitsu; on 28 December the Maibara–Tamura section is electrified at 1,500 V DC.
  • 196929 September: the Uramoto–Arimagawa section is rerouted through the Kubiki Tunnel and double-tracked; the same year, double-tracking and electrification of the whole line are completed.
  • 19871 April: Japanese National Railways is divided and privatised; JR West succeeds to the entire Maibara–Naoetsu line.
  • 199114 September: the Tamura–Nagahama section is converted from 20 kV AC to 1,500 V DC.
  • 200624 September: the Nagahama–Tsuruga section is converted to 1,500 V DC; from 21 October, direct DC services run from the Kansai region to Tsuruga.
  • 201514 March: with the Hokuriku Shinkansen extended Nagano–Kanazawa, the Kanazawa–Naoetsu section (177.2 km) is separated from JR West — Kanazawa–Kurikara to IR Ishikawa Railway, Kurikara–Ichiburi to Ainokaze Toyama Railway, Ichiburi–Naoetsu to Echigo Tokimeki Railway.
  • 202416 March: with the Hokuriku Shinkansen extended Kanazawa–Tsuruga, the Tsuruga–Kanazawa section (130.7 km) is separated — Tsuruga–Daishōji to Hapi-Line Fukui and Daishōji–Kanazawa to IR Ishikawa Railway — leaving JR West only the 45.9 km Maibara–Tsuruga remnant.

Sources