Echizen Railway line3 min read

Mikuni Awara Line

三国芦原線

The Mikuni Awara Line (三国芦原線, Mikuni-awara-sen) is a 25.2-kilometre railway line operated by Echizen Railway in Fukui Prefecture. It runs from Fukuiguchi, in the prefectural capital Fukui, through the northern Fukui Plain to the old port town of Mikuni, ending at Mikuni-Minato station in Sakai.

The line serves 23 stations on a single-track, 1,067 mm narrow-gauge alignment electrified at 600 V DC, and gives access to well-known sights such as Awara Onsen and Tōjinbō. Although it nominally begins at Fukuiguchi, trains run through onto the Katsuyama Eiheiji Line to terminate at Fukui Station. Like its sister route, the Mikuni Awara Line is a former Keifuku Electric Railway line that was suspended after a pair of accidents in 2000–2001 and revived by Echizen Railway in 2003.

Fukui5 km
Route of the Mikuni Awara Line · Fukui · Boundaries: MLIT / GSI / Japan Post

History

The line grew out of a string of pre-war local-railway schemes. A plan to link Fukui with Mikuni and Daishōji was licensed to the Kaetsu Electric Railway in 1919; the depressed economy that followed the First World War stalled it, and the company was renamed Yoshizaki Electric Railway, which was formally established in 1924. From about 1925 Kyoto Dentō (Kyoto Electric Lamp) joined the venture, and in 1927 the company was renamed Mikuni Awara Electric Railway and construction finally began.

Mikuni Awara Electric Railway opened its first section, Fukuiguchi to Awara (now Awara-Yunomachi), on 30 December 1928. The line was extended the following year to Mikunichō (now Mikuni), and through running began over Kyoto Dentō's Echizen Main Line — the present Katsuyama Eiheiji Line — into Fukui. A coastal extension from Densha-Mikuni out to Tōjinbōguchi opened in 1932, giving the railway its fullest pre-war extent.

During the war, the Mikuni Awara Electric Railway was absorbed into Keifuku Electric Railway on 1 August 1942 and became Keifuku's Mikuni Awara Line — the name it has carried ever since. Wartime priorities then reshaped the route. In January 1944 the coastal Densha-Mikuni–Tōjinbōguchi branch was suspended as a non-essential line, and in October 1944 Keifuku leased the state-owned Mikuni Line between Mikuni and Mikuni-Minato, electrified it at 600 V DC, and opened it for through service; that segment became the line's present terminus arrangement.

For the next half-century the Mikuni Awara Line settled into the role of a local railway running through the Fukui Plain, shedding freight and converting to driver-only operation. Then disaster overtook its sister route. Two accidents in 2000 and 2001 on Keifuku's Echizen Main Line prompted a business-improvement order from the authorities, and Keifuku suspended all operations on the Mikuni Awara Line as well in June 2001, leaving both lines without trains.

The transfer to Echizen Railway was approved by the Ministry of Land, Infrastructure and Transport in January 2003, and Echizen Railway took the line over from Keifuku on 1 February 2003. Service was restored in two stages later that year: the Fukuiguchi–Nishi-Nagata section reopened on 20 July 2003, and the Nishi-Nagata–Mikuni-Minato section on 10 August 2003, returning trains to the entire line. The reopening was accompanied by station renamings, including Awara-Yumachi to Awara-Yunomachi and Nishi-Fukui to Fukudaimae-Nishi-Fukui.

Since reopening, the line has been modernised and more closely woven into Fukui's local network. A new station, Matsumoto Machiya, opened in 2015. In March 2016 mutual through-running with the Fukui Railway Fukubu Line began over the Tawaramachi–Washizuka-Haribara section, branded the "Phoenix Tawaramachi Line." Station numbering was introduced across the line in 2017, and in 2018 Fukuiguchi Station was rebuilt as an elevated station. Daytime trains between Fukui and Mikuni-Minato run twice an hour and carry on-board attendants.

Stations on this line

Timeline

  • 191926 December: a railway licence is granted to the Kaetsu Electric Railway for lines from Mikuni to Fukui and from Mikuni toward Ishikawa, the scheme from which the line ultimately grew.
  • 192410 November: with the original plan stalled by the slump that followed the First World War, the renamed company, Yoshizaki Electric Railway, is formally established.
  • 1927The company, now with Kyoto Dentō participating in its management, is renamed Mikuni Awara Electric Railway and construction begins.
  • 192830 December: Mikuni Awara Electric Railway opens its first section, Fukuiguchi–Awara (now Awara-Yunomachi).
  • 192931 January: the Awara–Mikunichō (now Mikuni) section opens. Through operation onto the Kyōto Dentō Echizen Main Line into Fukui Station begins the same year.
  • 1932The coastal extension from Densha-Mikuni to Tōjinbōguchi opens, giving the line its fullest pre-war extent.
  • 19421 August: during the war, Mikuni Awara Electric Railway merges into Keifuku Electric Railway and the route becomes Keifuku's Mikuni Awara Line.
  • 194411 January: the coastal Densha-Mikuni–Tōjinbōguchi branch is suspended as a non-essential wartime line (later abolished).
  • 194411 October: Keifuku leases the state-owned Mikuni Line between Mikuni and Mikuni-Minato, electrifies it at 600 V DC and opens it for through service, forming the line's present terminus section.
  • 2001June: following two accidents (2000 and 2001) on Keifuku's Echizen Main Line and a resulting business-improvement order, Keifuku suspends all operations on the Mikuni Awara Line.
  • 20031 February: Echizen Railway takes the line over from Keifuku (the transfer was approved by the Ministry of Land, Infrastructure and Transport on 17 January).
  • 200320 July: the Fukuiguchi–Nishi-Nagata section reopens (with Awara-Yumachi renamed Awara-Yunomachi and Nishi-Fukui renamed Fukudaimae-Nishi-Fukui). 10 August: the Nishi-Nagata–Mikuni-Minato section reopens, restoring trains over the whole line.
  • 201527 September: Matsumoto Machiya Station opens.
  • 201627 March: mutual through-running with the Fukui Railway Fukubu Line begins over the Tawaramachi–Washizuka-Haribara section, branded the "Phoenix Tawaramachi Line."
  • 201725 March: station numbering is introduced across the line.
  • 201824 June: Fukuiguchi Station is rebuilt from a ground-level station into an elevated station.

Sources