History
The line was not built by the state but by the Kansai Railway, a private company that planned a railway along the Tōkaidō between Nagoya and Ōtsu (later changed to Kusatsu). The first section, between Kusatsu and Mikumo, opened on 15 December 1889, with Ishibe and Mikumo stations; it was the Kansai Railway's first line, and its starting point was Kusatsu.
On 19 February 1890 the railway was extended from Mikumo through to Tsuge, opening Fukakawa and Tsuge stations and completing the line. The Kansai Railway extended its line to Nagoya in 1895.
The corridor's status changed in 1898. On 19 April that year the Kansai Railway reorganised its main line, redefining it to run between Nagoya and Kamo rather than between Nagoya and Kusatsu; as a result the Tsuge–Kusatsu stretch was demoted from main line to a branch. Kibukawa Station, which gave an interchange with the Ōmi Railway, was added on 29 December 1900.
The Kansai Railway was nationalised on 1 October 1907. The Tsuge–Kusatsu branch thereby passed to the national railways, and on 12 October 1909, when the government adopted formal line names, the section between Tsuge and Kusatsu was designated the Kusatsu Line.
For most of the twentieth century the line was worked by steam and later diesel traction. Centralised traffic control (CTC) was commissioned in 1979, and the whole line was electrified at 1,500 V DC on 3 March 1980, when electric multiple units were introduced. On 1 April 1987, with the division and privatisation of Japanese National Railways, the line passed to the newly formed West Japan Railway Company, which operates it today; freight services between Tsuge and Kibukawa ended the same day.
A new station, Minami-Biwako, was proposed to let passengers transfer between the Tōkaidō Shinkansen and the Kusatsu Line; construction began in May 2006 with completion planned for 2012. The scheme collapsed after the Ōtsu District Court ruled in September 2006 that Rittō City's issuing of bonds to fund the station was unlawful under local finance law, and the project was halted and then formally abandoned in October 2007.
Stations on this line
11 stations tracked on the map, listed alphabetically. Select any to read its page.
Timeline
- 188915 December: the Kansai Railway opens the first section, Kusatsu–Mikumo, together with Ishibe and Mikumo stations.
- 189019 February: the line is extended from Mikumo to Tsuge, opening Fukakawa and Tsuge stations and completing the line.
- 189819 April: the Kansai Railway redefines its main line to run Nagoya–Kamo instead of Nagoya–Kusatsu, and the Tsuge–Kusatsu section becomes a branch line.
- 190029 December: Kibukawa Station opens, giving an interchange with the Ōmi Railway.
- 19071 October: the Kansai Railway is nationalised; the branch passes to the national railways.
- 190912 October: the section between Tsuge and Kusatsu is formally designated the Kusatsu Line.
- 1979Centralised traffic control (CTC) signalling is commissioned on the line.
- 19803 March: the whole line is electrified at 1,500 V DC.
- 19871 April: with the division and privatisation of Japanese National Railways, the line passes to the West Japan Railway Company (JR West), and freight services between Tsuge and Kibukawa end.
- 2006May: construction begins on a proposed new station, Minami-Biwako, for transfers to the Tōkaidō Shinkansen; in September the Ōtsu District Court rules Rittō City's funding bonds unlawful and the project is halted.
- 2007October: the Minami-Biwako station project is officially abandoned.
Sources
Last updated 16 October 2026.