History
The Kakamigahara Line did not begin as a Meitetsu undertaking. Its promoters invited local notables along the route, the Mino Electric Railway and the original Nagoya Railroad to take part in planning the line. A railway licence for a line from Kita-Nagamori village to Unuma village in Inaba District was granted on 19 June 1923, and that December the starting point was moved into the city of Gifu.
Construction proceeded in stages. The first section opened on 21 January 1926, between Arata and the stop in front of the army supply depot (Hokyūbu-ekimae). A further segment opened on 1 August 1926, and the line was extended again on 20 September 1927. The route was completed on 28 December 1928 when the Nagazumichō–Arata section opened. As built it was electrified at 600 V DC.
On 28 March 1935 the company that owned the line was absorbed by the Meiki Railway (名岐鉄道), and the line became the Meiki Railway's Kakamigahara Line. Only months later, on 1 August 1935, the Meiki Railway merged with the Aichi Electric Railway and renamed itself the Nagoya Railroad (Meitetsu), the company that operates the line today.
Under Meitetsu the line was progressively upgraded. The section from the Gifu end as far as Ogase was double-tracked in a series of works carried out between 1938 and 1942. During the Second World War several stations were suspended in 1944, and Kakamigahara, with its airfield and military installations, was bombed in 1945; three of the suspended stations reopened in 1946 and 1947.
On 15 March 1964 the final single-track section, from Ogase to Shin-Unuma, was doubled, the overhead line voltage was raised from 600 V to 1,500 V DC, and through running with the Inuyama Line began. The higher voltage allowed the line's maximum speed to be increased from 65 km/h to 85 km/h.
In later decades the line's connections changed. From 1970 a short link at Tagami Station allowed through services from the Mino-machi Line to reach the Kakamigahara Line; this arrangement ended on 1 April 2005, when the Tagami Line and Mino-machi Line were abolished. On 29 January 2005 several stations were renamed, including the Gifu terminus, which became Meitetsu-Gifu. One-man operation began on 18 March 2023.
Stations on this line
18 stations tracked on the map, listed alphabetically. Select any to read its page.
Timeline
- 192319 June: a railway licence is granted for a line between Kita-Nagamori and Unuma villages in Inaba District.
- 192413 April: the Kakamibara Railway is incorporated, with Nakajima Jun as president and capital of one million yen.
- 192621 January: the first section opens, between Arata and Hokyūbu-ekimae (the stop in front of the army supply depot), electrified at 600 V DC.
- 19261 August: the line is extended, opening the Kakamino–Nirentaimae section.
- 192720 September: the line is extended again, opening the Nirentaimae–Higashi-Unuma section.
- 192828 December: the Nagazumichō–Arata section opens, completing the line.
- 193528 March: the company that owns the line is absorbed by the Meiki Railway, and the line becomes the Meiki Railway's Kakamigahara Line.
- 19351 August: the Meiki Railway merges with the Aichi Electric Railway and renames itself the Nagoya Railroad (Meitetsu).
- 1938Double-tracking of the line begins; the Nagazumichō–Tagami section is doubled on 18 July, part of the staged Gifu-to-Ogase double-tracking carried out from 1938 to 1942.
- 194222 October: the Nijikken–Ogase section is double-tracked, completing the Gifu-to-Ogase doubling.
- 194522 June: stations on the line are damaged in the bombing of Kakamigahara during the Second World War.
- 196415 March: the final single-track section (Ogase–Shin-Unuma) is doubled, the voltage is raised from 600 V to 1,500 V DC, and through running with the Inuyama Line begins; the maximum speed rises from 65 km/h to 85 km/h.
- 197025 June: the Tagami Line opens, allowing Mino-machi Line trains to run through onto the Kakamigahara Line at Tagami Station.
- 200529 January: several stations are renamed, including the Gifu terminus, which changes from Shin-Gifu to Meitetsu-Gifu.
- 20051 April: the Tagami Line and Mino-machi Line are abolished, ending through running from the Mino-machi Line.
- 202318 March: one-man (driver-only) operation begins on the line.
Sources