Station

Watada

和多田

View on the map →

Watada
Photo: MaedaAkihiko · CC BY-SA 4.0 (opens in a new tab) · Wikimedia Commons (opens in a new tab)

Timetable information

Known weekday departures: 2/day · Known Sat & holiday departures: 48/day

First / last known departure (weekday): 4:47 / 24:36 (00:36 next day)

Busiest hour (known departures): 0:00–1:00 (1)


Figures are the departures known from the timetable data, not a count of today's actual service.

Timetable data as of 2 May 2026 (retrieved in spring/summer 2026).

Adjacent stations

Location

History

Watada Station opened on 22 March 1983. It is an elevated, single-side-platform halt in Karatsu, Saga Prefecture, 40.9 km from the line's origin at Meinohama on the Chikuhi Line, served by both local and weekday rapid trains. JR Kyushu took over operation on 1 April 1987 with the breakup of Japanese National Railways; the station is unstaffed.

Sources