Timetable information
Known weekday departures: 725/day · Known Sat & holiday departures: 507/day
First / last known departure (weekday): 5:02 / 24:40 (00:40 next day)
Busiest hour (known departures): 7:00–8:00 (57)
0:00 ─ 23:00
Figures are the departures known from the timetable data, not a count of today's actual service.
Timetable data as of 4 July 2026 (retrieved in spring/summer 2026).
Adjacent stations
- Sotetsu Shin-Yokohama Line: Hazawa yokohama-kokudai
- Sotetsu Main Line: Tsurugamine
Location
History
Nishiya Station opened on 1 December 1926 as a stop on the Jinchu Railway, then a single-line operation between Atsugi and Hoshikawa (now Kamihoshikawa). Operation passed to Sagami Railway when Jinchu was absorbed in 1943, and electrification of the line had been completed the previous year. A footbridge station with an island-platform configuration arrived in May 1966, and double-tracking was completed in 1952. On 30 November 2019 Nishiya became the junction for the new Sōtetsu Shin-Yokohama Line connecting to JR East services via Hazawa Yokohama-Kokudai. Through services to the Tōkyū network began on 18 March 2023, and all express categories now stop at the station.
Notes
The Tōkaidō Shinkansen viaduct crosses directly over the station, and one of its support columns stands on a platform.
Sources
- Wikipedia (English) (opens in a new tab)
- Wikipedia (日本語) (opens in a new tab)
- Photo: 東経待機 · CC BY-SA 4.0 (opens in a new tab) · Wikimedia Commons (opens in a new tab)
Last updated: 2026-08-18