Timetable information
Known weekday departures: 66/day · Known Sat & holiday departures: 63/day
First / last known departure (weekday): 5:39 / 23:56
Busiest hour (known departures): 15:00–16:00 (6)
0:00 ─ 23:00
Figures are the departures known from the timetable data, not a count of today's actual service.
Timetable data as of 2 May 2026 (retrieved in spring/summer 2026).
Adjacent stations
- Meitetsu Nagoya Main Line: Meitetsu-Ichinomiya ⇄ Shima-Ujinaga
Location
History
Myōkōji Station opened on 3 February 1924 on the Meitetsu Nagoya Main Line; the name was taken from the nearby Zen temple Myōkōji (formally Myōkō Hōon Zenji). The station became unstaffed sometime before 1 November 1948, and the tracks were elevated on 21 February 1993. Even after elevation the station sits on consecutive 1,000-metre-radius curves between Kōnomiya and Meitetsu-Ichinomiya, and trains stop with their leading car aligned to the platform end regardless of formation length. Tranpass was introduced in spring 2003 along with a remote-monitoring control system, and manaca acceptance began on 11 February 2011.
Notes
Before the line was elevated, the up and down platforms were staggered as at Shimaujinaga Station, with a gap between the two platforms; as a legacy of this, the distance to walk between the north and south ticket gates remains long for six-car trains even today.
Sources
- Wikipedia (日本語) (opens in a new tab)
- Photo: ButuCC · CC BY-SA 4.0 (opens in a new tab) · Wikimedia Commons (opens in a new tab)
Last updated: 2026-09-11