Timetable information
Known weekday departures: 93/day · Known Sat & holiday departures: 93/day
First / last known departure (weekday): 5:27 / 23:44
Busiest hour (known departures): 7:00–8:00 (9)
0:00 ─ 23:00
Figures are the departures known from the timetable data, not a count of today's actual service.
Timetable data as of 2 May 2026 (retrieved in spring/summer 2026).
Adjacent stations
- Chikuho Main Line: Chikuzen-Habu ⇄ Chikuzen-Ueki
Location
History
Kurate Station opened on 1 July 1987 as an additional stop on the existing Chikuhō Main Line track in the town of Kurate, Fukuoka Prefecture. It was opened by JR Kyushu, which still operates it, and sits 18.7 km from the line's starting point at Wakamatsu. On 4 March 2017 Kurate became a remotely managed "Smart Support Station": although unstaffed on site, passengers using the ticket machines or gates can call for help by intercom from a central support centre at Nakama. The station has two side platforms that are not directly opposed, with the tracks running on the east side of each, linked by a sheltered footbridge.
Sources
- Wikipedia (English) (opens in a new tab)
- Photo: Kouchiumi · CC BY-SA 3.0 (opens in a new tab) · Wikimedia Commons (opens in a new tab)
Last updated: 2026-09-03