Station

Kawanishi (Yamaguchi)

川西

Kawanishi (Yamaguchi)
Wikimedia Commons (see file page for author + license)

Train service

Weekday departures: 43/day · Sat & holiday departures: 43/day

First / last train (weekday): 5:07 / 22:46

Busiest hour: 6:00–7:00 (4)

▂██▆▄▄▄▂▄▄▂▆▆▆▄▆█▂
0:00 ─ 23:00

Counts are departures in the timetable data shown on our live map.

Adjacent stations

Location

History

Kawanishi opened on 16 April 1960 as an infill stop on the JNR Gantoku Line between Nishi-Iwakuni and Hashirano, accepting only diesel-railcar passengers and unstaffed from the start. It became a nominal branch terminus on 1 November the same year when the JNR Ganzai Line opened to Kawayama. Around autumn 1977 the platform was extended in both directions following a local petition, allowing the previously-passing-through 10-car loco-hauled passenger trains to stop here. The station passed to JR West at privatisation on 1 April 1987, and on 25 July 1987 the Ganzai Line was transferred to Nishikigawa Railway, making the stop a joint JR West/Nishikigawa station.

Notes

Kawanishi is the operational starting point of the Nishikigawa Seiryū Line — a 0-km post sits on the platform — but the physical junction with the JR Gantoku Line is 1.9 km further on at Morigahara Signal Box. The two operators share that 1.9 km section as joint Class-1 rail businesses, and every Nishikigawa Seiryū Line train runs through onto JR tracks to Iwakuni: JR fares apply on the Iwakuni–Kawanishi section even on Nishikigawa Railway rolling stock.

Sources