Timetable information
Known weekday departures: 125/day · Known Sat & holiday departures: 109/day
First / last known departure (weekday): 5:35 / 24:12 (00:12 next day)
Busiest hour (known departures): 8:00–9:00 (9)
0:00 ─ 23:00
Figures are the departures known from the timetable data, not a count of today's actual service.
Timetable data as of 2 May 2026 (retrieved in spring/summer 2026).
Adjacent stations
- Kintetsu Nara Line: Kawachi-Hanazono ⇄ Hyotan-yama (Osaka)
Location
History
Higashi-Hanazono Station opened on 22 November 1929 as Rugby-Undoujō-mae Station, a seasonal halt timed to the inauguration of the neighbouring Hanazono Rugby Stadium and initially serving only on match days. The line passed to Kansai Kyūkō Electric Railway in 1941 and to Kintetsu in 1944, and the station was renamed Rugby-Jō-mae in 1950. It was renamed Higashi-Hanazono in 1967 alongside the completion of the adjacent inspection depot. A long programme of grade separation raised the down platforms onto a viaduct in 2010 and the up platforms in 2014.
Notes
The post-viaduct station building wears a rugby-ball monument that nods to the nearby Hanazono Rugby Stadium.
Sources
- Wikipedia (English) (opens in a new tab)
- Wikipedia (日本語) (opens in a new tab)
- Photo: PekePON · CC BY-SA 3.0 (opens in a new tab) · Wikimedia Commons (opens in a new tab)
Last updated: 2026-09-02