History
The line was the work of the Fukubu Electric Railway (福武電気鉄道), which received its railway licence for a Takefu–Fukui route on 2 September 1920 and was incorporated on 12 August 1921. The first section, between Takefu-shin and Heiei (the present Shinmei), opened on 23 February 1924, and was extended north towards Fukui on 26 July 1925. Several intermediate stations followed over the next few years.
The push into the heart of Fukui came in the 1930s. On 15 October 1933 the line was extended from Fukui-shin (the present Sekijūjimae) into the city as a tramway; the company had received its tramway licence in 1927, and the street-running section let trains run directly to the city centre. The original Heiei terminus was later renamed Chūō, and express services began running in 1941.
The modern operator was born of wartime consolidation. On 1 August 1945 the Fukubu Electric Railway merged with the Seiho Electric Railway (鯖浦電気鉄道) to form the Fukui Railway. Under the new company the central tramway network grew: the section from Honmachi-dōri to Tawaramachi opened on 27 November 1950, giving the line its northern street-running terminus, and through-running with the Seiho Line began in 1959. The line was double-tracked in places and steadily modernised through the post-war decades.
Later the line was rationalised. Freight operations ended in October 1979, centralised traffic control was completed in 1980, and driver-only "wanman" operation was introduced in 1985. New stations such as Harmony Hall (1997) were added, while some inner-city stops were closed; the Honmachi-dōri tram stop, for instance, was abolished in 2002.
The twenty-first century brought an LRT-style transformation. In 2006 every platform on the railway section was lowered and low-floor trams entered service across the whole line, and in 2013 the company introduced its F1000 "FUKURAM" low-floor cars. On 27 March 2016 through-running began with the Echizen Railway's Mikuni Awara Line — letting Fukubu Line trams run beyond Tawaramachi out to Washizuka-Haribara — and the city-centre track was extended to bring trams right up to Fukui Station's west plaza. More recent changes have included renaming Echizen-Takefu, the line's starting point, as Takefu-shin (たけふ新) in 2023 and the introduction of nationwide IC fare cards in 2024.
Stations on this line
25 stations tracked on the map, listed alphabetically. Select any to read its page.
- Asozu浅水
- Asuwayama-Koenguchi足羽山公園口
- Bell-maeベル前
- Ebata江端
- Fukui (Fukui · Fukui Railway)福井駅
- Fukuijousidaimyoumachi福井城址大名町
- Hanando花堂
- Harmony Hallハーモニーホール
- Iehisa家久
- Jin'ai Joshikoko仁愛女子高校
- Kitago (Fukui)北府
- Mizuochi水落
- Nishi-Sabae西鯖江
- Nishiyama-Koen西山公園
- Sanjuhassha三十八社
- Seimei清明
- Sekijujimae赤十字前
- Shinmei神明
- Shokokaigisho-mae商工会議所前
- Sports Koenスポーツ公園
- Sundome Nishiサンドーム西
- Taichonosato泰澄の里
- Takefu-shinたけふ新
- Tawaramachi (Fukui)田原町
- Tobanaka鳥羽中
Timeline
- 19202 September: a railway licence is granted for a line between Takefu and Fukui.
- 192112 August: the Fukubu Electric Railway is incorporated.
- 192423 February: the Fukubu Electric Railway opens its first section, Takefu-shin to Heiei (now Shinmei).
- 192526 July: the line is extended from Heiei towards Fukui.
- 193315 October: the line is extended into central Fukui as a street-running tramway.
- 1939/
1940 Heiei Station is renamed Chūō. The year is given as 1939 or 1940. - 19411 April: express services begin.
- 19451 August: the Fukubu Electric Railway merges with the Seiho Electric Railway to form the Fukui Railway.
- 195012 July: the Hanandō–Fukui-shin section is double-tracked. 27 November: the Honmachi-dōri–Tawaramachi section opens.
- 195920 July: Mizuochi Station is relocated and through-running with the Seiho Line begins.
- 1979October: freight operations are discontinued.
- 198010 April: centralised traffic control (CTC) is completed.
- 19851 August: driver-only (wanman) operation is introduced.
- 199720 September: Harmony Hall Station opens.
- 200215 July: Honmachi-dōri tram stop is abolished.
- 20061 April: low-floor trams enter service across the whole line, following the lowering of platforms at every station on the railway section in early 2006.
- 201331 March: the F1000 "FUKURAM" low-floor tram is introduced.
- 201627 March: through-running begins with the Echizen Railway Mikuni Awara Line (trams run beyond Tawaramachi to Washizuka-Haribara), and the city-centre track is extended to reach Fukui Station's west plaza.
- 202325 February: Echizen-Takefu, the line's starting point, is renamed Takefu-shin.
- 202411 October: nationwide IC fare cards (ICOCA and others) come into use.
Sources
- Wikipedia (English)
- Wikipedia (日本語)
- Wikidata (Q3537109)
- 会社概要|福井鉄道株式会社 (Fukui Railway company profile and history)
Last updated 16 October 2026.