History
The Tachiarai Airfield, an Imperial Japanese Army airbase opened in the area in 1919, had been served by light railways—the Chūō Tramway and the Asakura Tramway—but their limited capacity prompted plans for a dedicated army siding to the airfield. This became the genesis of the Amagi Line. Construction of the state railway's Amagi Line was formally decided in December 1935, work began in May 1937, and the line opened between Kiyama and Amagi on 28 April 1939, at first with stations at Chikugo-Ogōri, Chikugo-Matsuzaki, Nishi-Tachiarai, Tachiarai and Amagi.
Chikuzen-Takata Station was added on 1 November 1960. The railway also carried freight for the Kirin Brewery's Fukuoka plant, which opened in 1966 on the former airfield site, but as that traffic shifted to road haulage the line's freight operations were wound down, ending in 1984—the Tachiarai–Amagi section on 1 February and the Kiyama–Tachiarai section on 19 September.
On 18 September 1981 the Amagi Line was approved for abolition as one of the first group of "specified local lines". Because the Nishitetsu Amagi Line already served the area, neither Saga nor Fukuoka Prefecture objected to replacing the line with buses; the municipalities of Amagi and Miwa, however, asked that the railway be kept running. On 5 April 1985 it was agreed instead to hand the line to a newly formed third-sector company.
That company, Amagi Railway, took over the former JNR line on 1 April 1986. The conversion was accompanied by a renaming of several stations—Chikugo-Ogōri to Ogōri, Chikugo-Matsuzaki to Matsuzaki and Chikuzen-Takata to Takata—and Ogori Station was moved about 400 metres east to give a more convenient transfer to Nishitetsu Ogori Station on the Tenjin Ōmuta Line. Under third-sector operation the company set about adding stations and services: Tateno, Ōitai and Yamaguma stations opened on 1 November 1987, Imaguma followed on 1 December 2002, and the Ōhara signal box was established on 1 April 2003, allowing trains to run at roughly fifteen-minute intervals during the morning and evening peaks.
Every train runs the full length of the route between Kiyama and Amagi, with no services starting or terminating at intermediate stations, and most are worked by a single crew member, except for two-car trains in the morning peak. The number of daily services grew from seven return trips in 1982, in the line's last JNR years, to 42 on weekdays by the early 2020s, and the line's older AR400-series railcars are scheduled to be replaced by new ARe500-series diesel-electric cars from 2025.
On 4 July 2006 heavy rain tilted part of the Hōman River bridge, closing the section between Ōitai and Matsuzaki; the gap was bridged by substitute buses until services resumed on 20 December 2006. The Amagi Line connects with the Kagoshima Main Line at Kiyama and, via the transfer at Ogori, with the Nishitetsu network, carrying chiefly local commuters and students.
Stations on this line
11 stations tracked on the map, listed alphabetically. Select any to read its page.
Timeline
- 1935December: construction of the state railway's Amagi Line is formally decided.
- 1937May: construction of the Amagi Line begins.
- 193928 April: the Amagi Line opens between Kiyama and Amagi, with stations at Chikugo-Ogori, Chikugo-Matsuzaki, Nishi-Tachiarai, Tachiarai and Amagi.
- 19601 November: Chikuzen-Takata Station opens.
- 198118 September: the line is approved for abolition as one of the first group of specified local lines.
- 1984Freight services end: the Tachiarai–Amagi section on 1 February and the Kiyama–Tachiarai section on 19 September, after Kirin Brewery traffic shifts to road haulage.
- 19855 April: it is agreed that the line will be transferred to a newly created third-sector railway company.
- 19861 April: the line is converted to the third-sector Amagi Railway; Chikugo-Ogori (relocated ~400 m east), Chikugo-Matsuzaki and Chikuzen-Takata stations are renamed Ogori, Matsuzaki and Takata.
- 19871 November: Tateno, Oitai and Yamaguma stations open.
- 20021 December: Imaguma Station opens.
- 20031 April: the Ohara signal box is established, enabling roughly fifteen-minute peak intervals.
- 20064 July: heavy rain tilts part of the Homan River bridge, closing the Oitai–Matsuzaki section; service resumes on 20 December with buses bridging the gap in between.
Sources
Last updated 16 October 2026.